Watch the Video
Two Roads to the Critical Line
Visual comparison of Paul Cooper’s October 2026 FLINT Riemann workbench — now also backed by the 15-module / 522-declaration Lean 4.35.0 F04Riemann suite — and Levent Alpöge & Claude’s November 2026 Lean 4 proof. Pick horizontal or vertical below.
Full · Horizontal 16:9 (7:46)
Full · Vertical 9:16 (7:46)
Short · Vertical 9:16 (1:51)
Short · Horizontal 16:9 (1:51)
Full Horizontal 1080p · 7m 46s · 312 MB
Jump to a chapter · or open its matching 3D stage
00:00
1. One Critical Tightrope, Two Maps
How zeros on the ½ line tune prime rhythms — and why 30-digit rounding can fake failure.
Explore in 3D →
01:08
2. Mirror Seesaws vs. Stepanov’s Bridge
Keeping mirror pairs together and closing all 2r − 2 cross-window balance modes.
Explore in 3D →
02:13
3. Mixed-Term Obstructions vs. Theta Lifts
Why overlapping smooth cutoffs and wide windows hit a sharp mathematical wall.
Explore in 3D →
03:19
4. 29 FLINT Cages vs. Breaking 2/3
Locking the first 29 zero pairs below height 100 under an unconditional tail shield.
Explore in 3D →
04:30
5. Seven Schur Windows vs. Galois Cost Control
Full 7×7 LDLᵀ factorization certifying positivity across 21 prime bridges where row sums dip.
Explore in 3D →
05:37
6. FLINT Transcripts vs. Lean 4 Kernel
Classical Weil equivalence (RH ⇔ Q ≥ 0) and 522 kernel-audited declarations.
Explore in 3D →
06:44
7. Why Visual Workbenches & Proofs Need Each Other
Inspect all 15 Lean 4 modules alongside the interactive matrix, boundary, and Weil lab.
3-Tab Lab →
Explore the companion exhibition & proofs. Step through all 6 stress-tests live in 3D, inspect the 15 F04Riemann Lean modules, or review all 789 audited declarations.